Start with a free estimate and get clear recommendations, product options and pricing based on your own home and what you actually want out of the project.
With over 24 years in business, 2FL Windows & Siding has been a trusted exterior home improvement contractor since 2002.
I had this company come out to replace my windows and I couldn't be any happier with the service that was provided. I have 3 young kids running around and the team that did my windows were very patient, friendly, polite and they even cleaned…
We had a great experience with 2FL on a small re-siding project. They accommodated some requests we had which was appreciated. They were also much more responsive than other siding companies we talked to, which was ultimately why we decided to go with 2FL. For…
I had a roof replaced and 2FL did an excellent job. It took them 2 days to complete and the roof looks great. Many neighbors have commented on how nice it is. I highly recommend them.
1699 N Wollaston Dr, Post Falls, ID 83854
Monday – Friday, 8:00 AM – 5:00 PM
By Appointment OnlyA tear-off and replacement generally does, and it is issued by the City of Spokane Valley Permit Center rather than the City of Spokane. We pull it and schedule the inspection as part of the job.
Usually not. Below the shingle manufacturer’s minimum pitch, asphalt shingles are not a water barrier and the warranty will not stand behind them. Those sections need a membrane. We commonly run a membrane on the low-slope portion and shingles on the rest, tied together properly at the transition.
It can be. A layover hides rotted decking, reuses flashing that was already at the end of its life, and adds dead load to the structure. We tear off so we can see and replace what has actually failed.
Attic heat. It melts snow above the heated part of the roof, and the water refreezes over the cold overhang where there is nothing warm beneath it. The fix is air-sealing, insulation depth and balanced ventilation. We look at all three during the estimate.
Most single-family homes here are a two to four day job once we start, weather permitting. Larger roofs and multi-layer tear-offs run longer, and we tell you which one yours is before you sign anything.